top of page
fongzhuoran@gmail.com +60127200395
Advanced Architectural Construction
Project 1
Project 1 was a group assignment where we were tasked with designing a four-storey apartment using IBS components. We were assigned to use blockwork for the main construction method. My main task for this assignment was to create the 3D revit model of the apartment, and produce all the technical drawings needed.
PDF File
bottom of page